top of page
Purple - Blue Gradient

Fuel Injector Relocation Block 2018-2023 KTM, Husky & Gas Gas TPI Bikes

With this kit, you will be moving the fuel injectors from the sides of the cylinder to in between the throttle body and reed cage. Now, the bike will have lubrication when ever it’s running, and it will run better. You may end up turning your idle air screw in or out, to get the idle speed you want, when finished. 

KTM tpi relocation block.png

These are the parts you will get. The block, 2 plugs for where the injectors went, the bolts to hold together, the clamps for the lines and the small hose to make a split kit.

 

Also you will get the yellow line as the new oil line and a small rubber plug, to plug where the old oil line entered the throttle body

To have a clean, open work space, it’s really best to get to this point on the bike. Remove the tank and shrouds and seat. Remove the muffler and even the pipe if if you want. Then remove the lower two subframe bolts and loosen the top two.

 

Loosen the clamp that holds the airboot to the throttle body and lift the subframe up. The airboot likes to stick on the throttle body, so you may want to help it off with a flat blade screwdriver. Use a tie down or something to hold the subframe up if it keeps falling down.

Capture.PNG

Remove the injector from each side. They are held down by a 8mm head bolt. Pull and wiggle and they will come out.

​

Squeeze the sides of the gray wire clip together and pull the clips off of the injectors.

CaptureTPI.PNG

If you expand and pull on the metal clip, then it will release the injector and you can pull it out of the stock fuel rail.

a.PNG

O the right, you see the injector replacement plug ring inserted in the cylinder.  A little grease on both O rings, will help a lot, as far as it all sliding together easily.

 

Use the fuel rail from that side, to hold the plug in place.  You will cut the clamps away, and remove the fuel lines before this

IMG_4865.png

You'll need to remove these oetiker style clamps from the fuel lines.  The easiest way is to just grab underneath the tabs with the side snips and squeeze.  

Then the sides will come up and you can peel apart

And you can just use your same side snip pliers, to squeeze the new clamps shut, if you choose to use these kinds of clamps.

IMG_4892.jpeg
IMG_4893.jpeg

Now loosen the clamp that holds the throttle body in the rubber boot and pull it out. Remove the 4 8mm head bolts that hold the reed assembly to the crankcase and pull the rubber boot and reeds out.

 

The hardest part about this is just keeping the throttle body out of the way while doing this.

You'll want to remove the throttle body now, if you are planning to install the throttle plate adjustment screw.  

 

You may have already done this before, as it's a popular mod.

 

If not, go ahead and remove it, and then follow the instructions on our other instructional page 

"tpi idle adjustment screw install" 

c.PNG
d.PNG

Remove the 4 small torx head screws that hold the 2 parts of the reed block together.

 

Transfer the O ring from the plastic stock plate, to the new plate. You’ll have to pick it out with something little like this screwdriver.

 

It’s already in place on the new plate here.

 

You’ll take the other part of the reed block and fasten to the new plate with the same torx head screws.

e.PNG
f.PNG

Of course now would be the time to change the reeds, if you had bought our Power reeds.

 

You HAVE to use the stock reed cage for this application. They are the only ones that come apart so you can just use the reeds and reed block. All other aftermarket reed cage assemblies do not come apart

g.PNG

The rest of the procedure is pretty easy. The injectors fit into the new block as so. You can grease the o rings on the injectors if you want.

 

The top plate fits on and screws to the main plate with the 2 smaller allen head screws in the kit. It doesn’t not matter which injector goes where.

 

Also, the injectors have flimsy little dust seals on them and it's best not to use them..

 

Here, they are not on the injectors. You’ll re-use your stock green gasket between the new assembly here and the engine.

 

You'll want to install the new oil line now.  It fits real tight so it doesn't need a clamp

IMG_0820.jpeg

You can re-use the other green gasket between the rubber boot and new plate if you want, but leaving it out and just using RTV silicone to seal this area, will make the bike a bit snappier with throttle response.

 

This is because the distance is a bit shorter between the throttle plate and the reeds.

 

You will use the longer allen bolts supplied in the kit to bolt this all together. If the oil line to the throttle body is laying on the new block, then you may want to wrap some tape around it to keep it from rubbing.

TPI relocation block direct oil injection KTM Husky GasGas.jpeg

Also look into the "Injector Split Kit".  You add is to your order separately, but it simple to put together this way.

​

Most people who just do tighter single tack, like this set up better, with one injector left in the cylinder.

​

You will want to add oil to the gas in the tank for this though, so there is lube fed through the injector into the cylinder. 

​

One ounce of oil per gallon of gas or one ounce per 2 gallons, will add needed protection

split kit assembled.jpeg

IF YOU DON'T WANT TO RUN BOTH INJECTORS IN THE RELO BLOCK, THEN YOU CAN CONFIGURE THE FUEL LINES AS SHOWN HERE.

 

You’ll take one of the fuel lines here, from your stock fuel line setup (on the left side of pic ) and make the other little curved line you see between the new block and filter. Since they are already pre curved, it’s easy to take one of them.

 

It can get cut a bit shorter as well, so it fits clean and nice. You can see how it shapes out when done, here in the pic. You’ll use the hose clamps for this where needed. It doesn’t not matter which gray injector electrical clip goes on which injector.

relocation block hose arrangement.PNG
bottom of page